Mark's Pictures






Kayaking Pictures:

Alone on Little Tybee
Driftwood
Circumnavigating Pigeon Island 1
Circumnavigating Pigeon Island 2
Circumnavigating Pigeon Island 3
Circumnavigating Pigeon Island 4
Pigeon Island After Fire 1
Pigeon Island After Fire 2
Pigeon Island After Fire 3
Pigeon Island After Fire 4
Beth's First Time Kayaking 1
Beth's First Time Kayaking 2
East Side of Little Tybee
Chattahoochee River Race 1
Chattahoochee River Race 2
Chattahoochee River Race 3
Chattahoochee River Race 4
Chattahoochee River Race 5
Emma at Chattahoochee River Race
Family Outing 1
Family Outing 2
Family Outing 3
Family Outing 4
Family Outing 5
Family Outing 6
Paul and Aspen 1
Paul and Aspen 2
Kayaking with Aspen 1
Kayaking with Aspen 2
Aspen Playing in the Surf 1
Aspen Playing in the Surf 2
July 4 Outing 1
July 4 Outing 2
July 4 Outing 3
July 4 Outing 4
July 4 Outing 5
July 4 Outing 6
July 4 Outing 7
July 4 Outing 8



Family and Friends:

Girls Playing in the Kitchen
Aspen's Birthday 1
Aspen's Birthday 2
Aspen's Birthday 3
Aspen's Birthday 4
Emma's Birthday 1
Emma's Birthday 2
Girls In Their New Dresses
Girls Playing with Camille



Building a Greenland Skin-On-Frame Kayak No. 1 (16'9" LOA, 19" Beam):

Cutting Scarfs
Gluing Scarf Joints
Laying Out The Gunwales
Deck Beams
Completed Deck
Mortises For Ribs
Steam Box For Bending Ribs
Ribs (the ribs were not flattened enough in the center of the boat)
Emma's Test
With Masik, Stems, and Keelson
With Chines And Deck Stringers
Completed Oiled Frame
Nylon Skin
Skin Sewn
With Coaming
On Beach After 4 Coats Of Urethane
Layback
Paddling
Rolling
On Pigeon Island 1
On Pigeon Island 2



Greenland Skin-On-Frame Kayak No. 2 (16'6" LOA, 20.5" Beam):

Emma Testing the Frame (before chines) 1
Emma Testing the Frame (before chines) 2
Completed Frame 1
Completed Frame 2
Completed Frame 3
Skinned and Being Tested by Sean 1  (still needs deck rigging)
Skinned and Being Tested by Sean 2  (still needs deck rigging)
Completed 1
Completed 2
Paddling 1
Paddling 2



Building a 2006 CLC Shearwater 16 (16'2" LOA, 21" beam):

Wood
Stitched Together
Sill for Hatch
Epoxied 1  (pre-skeg)
Epoxied 2  (pre-skeg)
End Pour  (hole is cut for skeg)
Ready for Varnish 1
Ready for Varnish 2
Completed 1


Greenland Paddles:

Laminating Wood
Storm Paddle Drying
Pair of Paddles 1
Pair of Paddles 2
Pair of Paddles 3
Pair of Paddles 4